top of page
NOE goes Russia:
First NF210-6R arrived in Russia
After a 6 week trip from Mudau (Germany) through Travemuende and St. Peterburg finally our first NF210-6R arrived in Krasnojarsk and the Siberia forest. By end of February 2016 the combimachine was handed over to the customer. Here you can see some impressions from Siberia in winter. Have fun.
good luck in Siberia
Please reload


Heating the engines
with the cold temperatures in Siberia you have to be creative

NOE Service
in Russia Outfit

NOE Service
there is no bad weather, only wrong clothes

Heating the engines
with the cold temperatures in Siberia you have to be creative
1/14
bottom of page